Most decks built in Point Cook and across Wyndham need a building permit, and some also need a planning permit before building can start. The rules come from Victoria's Building Regulations and the Victoria Planning Provisions, which apply in every council, including the City of Wyndham, plus any overlays or estate guidelines on the property. This page sets those rules out in plain language so homeowners know what to expect before a deck is designed. Peak Decking prepares the drawings, engineering and soil test, and lodges the application with a registered building surveyor as part of every job that needs a permit, so the paperwork is never left to the owner.
GET A FREE QUOTE
12
Decking services
13
Point Cook and nearby suburbs covered
Free
Measure and written quote
3 steps
Measure, permit, build
Peak Decking Point Cook
The starting point is simple: in Victoria, building a deck generally needs a building permit. A few small decks are the exception.
Councils across Victoria state plainly that a building permit is needed to build a deck. That covers almost every deck attached to a house, every raised deck, and any deck with a roof, a balustrade or stairs. The permit confirms that the footings, frame, balustrade and stairs meet the Building Regulations and the National Construction Code.
Some councils publish an exemption for very small, low decks. Knox City Council's checklist, for example, lists free standing decks under 800 mm high with a floor area under 10 square metres as not needing a building permit. A small, low, free standing deck in the garden may therefore not need one. Anything larger, higher or attached to the house generally does. Each deck is checked against the current rules at the free measure.
Adding a roof over a deck turns it into a roofed structure, which needs a building permit in its own right, and pergolas and tall privacy screens have their own limits. As councils publish the Building Regulations, an open pergola needs a building permit if its floor area is more than 20 square metres, it is more than 3.6 metres high, or it sits more than 2.5 metres in front of the house; any roofed verandah or carport needs one regardless. A screen or fence higher than about 2 metres generally needs a building permit too, and screens fixed to a raised deck are covered by the deck's own permit. When a deck is planned with a roof or screens, they are drawn and permitted together. See alfresco decks.
Peak Decking Point Cook
A planning permit deals with whether a deck can be built on the land, and it comes before the building permit. For decks, the trigger is mostly about height.
Under the Victoria Planning Provisions, as councils publish them, a deck associated with a house generally does not need a planning permit where its finished floor level is not more than 800 mm above the ground. A deck higher than that can need one, depending on the lot size and zone. That is why many decks are designed to stay just under 800 mm where the yard allows. See elevated decks.
The 800 mm trigger mainly applies to residential lots under 300 square metres. Many newer homes in Point Cook, Williams Landing, Tarneit and Truganina sit on compact lots, so a raised deck there is more likely to need a planning permit than the same deck on a larger block in Werribee or Hoppers Crossing. The lot size is checked from the title at the start.
Some properties are covered by planning overlays, such as heritage, neighbourhood character or flooding overlays, which can require a planning permit for a deck regardless of height. Some estates also have their own design guidelines, which may need estate approval before work starts. Both are checked before the design is finalised.
Peak Decking Point Cook
Where a deck sits on the block can matter as much as how big it is.
A deck beside a pool or spa must not create a foothold within the pool barrier's non-climbable zone. Since December 2019, Victorian owners must register their pool or spa with council and lodge a certificate of barrier compliance, and Wyndham City Council notes pools and spas must be certified every four years. A deck that changes the barrier is drawn to keep it compliant. See pool decking.
Decks close to a side or rear boundary have to meet siting rules for height and setback, and a screen or fence on the boundary over about 2 metres generally needs a building permit. Drainage is planned so water from the deck does not run onto the neighbouring property.
A raised deck that looks into a neighbour's yard or habitable room windows can be required to have screening under the overlooking rules that apply when a planning permit is needed. That screening is commonly set to 1.7 metres above the deck floor on the overlooking sides. See deck privacy screens.
Peak Decking Point Cook
A building permit is issued by a registered building surveyor, not by the builder. Peak Decking prepares and lodges everything the surveyor needs.
A registered building surveyor, private or municipal, checks the design against the Building Regulations and the National Construction Code and issues the building permit. Where a planning permit is needed, it must be obtained first, and the building permit follows.
The application includes a site plan showing the deck's position and distance from boundaries, elevation drawings showing its height, and structural engineering for the footings, frame and balustrade. Wyndham sits on reactive basalt clay, so a soil test sets the AS 2870 site class and the footing design is based on it.
The building surveyor inspects the deck at set stages, typically the footings before concrete is poured and the finished deck with its balustrades and stairs. When the final inspection is passed, a certificate of final inspection is issued and becomes part of the property's records. A copy is handed over with the finished deck, so it is on hand if the house is ever sold or refinanced.
Peak Decking Point Cook
A deck built without a permit it needed can cause problems long after it is finished.
When a house is sold, a buyer's conveyancer or building inspector may ask for permits and final certificates for structures on the property. A deck without them can delay a sale, reduce what a buyer is willing to pay, or lead to a request to remove it or to seek approval after the fact, which is usually harder and more expensive than getting it right at the start.
A permit is about more than paperwork. The engineering and inspections behind it check that the footings suit the clay, the frame carries the load and the balustrade will stop a fall. An insurer may also question a claim involving work that needed a permit and did not have one. Every deck Peak Decking builds that needs a permit is lodged, inspected and signed off.

A visit to measure the house and the yard, talk through boards, layouts and finishes, and then a written, itemised quote.

Drawings, engineering and a soil test are prepared, overlays are checked and the building permit is lodged.

Footings, frame and boards are built and inspected at each stage, the site is cleaned up and the finished deck is handed over.
Generally yes. Most decks need a building permit. A small, low, free standing deck can be exempt. This is checked at the free measure.
A deck with a finished floor more than 800 mm above ground can need a planning permit, mainly on residential lots under 300 square metres. Lower decks generally do not.
Peak Decking prepares the drawings, engineering and soil test and lodges the application with a registered building surveyor. The owner signs the application.
The deck must not create a foothold within the pool barrier's non-climbable zone, and the barrier must stay compliant and certified.
Sometimes. If the deck overlooks a neighbour and a planning permit is needed, screening is commonly required on the overlooking sides.
It can cause problems when selling or making an insurance claim. Approval can sometimes be sought after the fact, but it is simpler to get the permit first.
GET A FREE QUOTE
BUSINESS
SERVICES
OPERATING HOURS
Sun: 6:00am - 10:00pm
Mon: 6:00am - 10:00pm
Tue: 6:00am - 10:00pm
Wed: 6:00am - 10:00pm
Thu: 6:00am - 10:00pm
Fri: 6:00am - 10:00pm
Sat: 6:00am - 10:00pm