Hoppers Crossing takes its name from Elizabeth Hopper, who opened and closed the wooden gates at the railway level crossing in the 1800s. It was open farmland until 1963, when former shearer Harold Baden Powell sold the first residential lots, and it grew quickly from 1970, when the station and the first primary school opened. Today most homes date from the 1970s and 1980s, with newer estates toward Tarneit and Truganina, which means many decks here are either being built for the first time on an older home or replaced after decades of sun. Peak Decking builds, replaces and restores decks across Hoppers Crossing, with stumps sized to a soil test, stainless fixings and finishes suited to the western plains.
GET A FREE QUOTE
12
Decking services
13
Point Cook and nearby suburbs covered
Free
Measure and written quote
3 steps
Measure, permit, build

Hoppers Crossing homes suit a range of decking, from classic hardwood on older brick houses to low-upkeep boards on newer ones.
Merbau remains the most popular hardwood here for its rich red-brown colour, and spotted gum gives a lighter Australian hardwood look. Both are hard, durable and suit the brick homes of the 1970s and 1980s. They need oiling to keep their colour, and merbau's tannin is managed so it does not stain nearby paving.
Composite decking needs no oiling or sanding and will not splinter, which suits owners replacing an old timber deck that needed constant care. Capped boards resist fading and stains, and lighter colours stay cooler underfoot in summer.
Treated pine is the most economical deck and can be stained to suit the house. It suits a large deck on a budget, a deck that will later carry a roof, or a family that wants to get outside sooner and upgrade the boards later. See timber decking.
Many original Hoppers Crossing decks are now thirty to fifty years old. Replacing one is a chance to fix old design problems as well as the boards.
Rot through the bearers and joists, timber stumps that have rotted at ground level, a deck that bounces or slopes toward the house, and boards that are soft across large areas are signs replacement is better value than patching. If the frame is mostly sound, a repair may be enough. See deck repairs.
The old deck is lifted, removed and disposed of, old timber stumps are dug out, and the ground is checked and reshaped so water drains away from the house. A soil test is done so the new footings suit the clay rather than reusing old stump holes.
Older decks were often built with a step down from the back door, too narrow for a table, or in the wrong place for the afternoon sun. A new deck can finish level with the door, be wide enough for dining, wrap around to a side area, or include broad steps that double as seating, so it suits how the family uses the yard today.


Beyond a simple deck, three designs suit Hoppers Crossing homes and blocks.
Many 1970s and 1980s homes have a family room or kitchen opening to the back yard. A deck at floor level off those doors creates a dry, level outdoor area for meals and entertaining, and replaces the narrow concrete step or small slab many of these homes were built with. See alfresco decks.
An open deck gets hot in summer sun. A pergola or a Colorbond, clear or insulated roof over part of the deck gives shade and rain cover, and is designed and permitted together with the deck so the posts and footings suit both.
A composite or hardwood deck around a pool gives a cool, non-splinter surface, designed so it does not create a foothold within the pool barrier. Where the yard falls away, a raised deck keeps the outdoor area level with the house. Once the deck is more than 1 metre above the ground, a balustrade at least 1 metre high is generally required, the frame is engineered and braced for its height, and stairs with a handrail lead down to the lawn. See pool decking and elevated decks.
Hoppers Crossing sits on the volcanic plains west of Melbourne, near Laverton RAAF, the Bureau of Meteorology station that records the local weather. Three local conditions shape every deck.
The basalt plains carry reactive clay that shrinks in dry summers and swells in wet winters, which is why many older decks here have sunk or tilted. A soil test sets the AS 2870 site class, and each stump sits on a concrete footing sized and set to the depth that class needs, using galvanised steel stumps instead of timber.
Laverton RAAF records about 8.5 hours of sun a day in January and a mean afternoon wind of 21 km/h across the year, rising to 23.5 km/h in December. Sun and wind dry and grey timber fast, so timber decks are oiled on every face with a UV-protecting oil and re-oiled every six to twelve months in full sun.
Older decks often used plain steel nails and screws that rust and stain the boards. New decks use stainless steel screws in pre-drilled holes, boards are laid with correct gaps, and air is kept moving under the deck so boards dry evenly and stay flat.


Many older decks can be saved with the right repairs and a fresh finish rather than a full replacement.
Sunken or rotted stumps are replaced with galvanised steel stumps on new footings, and the deck is jacked back to level. Rotted or split boards are replaced with matching timber, loose boards are re-fixed with stainless screws, and wobbly railings are re-fixed or replaced.
A grey, rough timber deck can be cleaned, sanded and oiled or stained to bring back its colour, after any repairs are done. In full sun, re-oiling every six to twelve months keeps it protected. See deck restoration and oiling.
Every job is priced from a free measure and a written, itemised quote. As a guide, treated pine is the most economical new deck, merbau sits in the middle, and spotted gum and composite cost more. Removing an old deck, restumping, a roof and a raised design are each listed separately.
Deck builders near you in Hoppers Crossing should know the older homes and the ground they sit on. Peak Decking measures every home before drawing anything and quotes in writing with every item listed.
The free measure records the door sill height, the fall of the yard, the condition of any existing deck, the distance to each boundary and where stormwater can go. The new deck is drawn to those numbers, so it sits level with the house and drains away from it.
Most decks need a building permit, and a deck more than 800 mm above ground can need a planning permit on a lot under 300 square metres or where an overlay applies. These are checked at the start and the permit is lodged as part of the job. See deck permits.


Peak Decking covers all of Hoppers Crossing, from the Princes Highway north to the edge of Tarneit and Truganina. A free measure can be booked for any address in the suburb.
Baden Drive and Powell Drive are named after Harold Baden Powell, who subdivided the first housing estate in 1963, and many nearby streets are named after Richmond footballers such as Jack Dyer and Kevin Bartlett. These are some of the oldest homes in the suburb, where deck replacement and restumping are the most common jobs.
The streets near the station, which opened in 1970, and the Princes Highway were mostly built in the 1970s and 1980s. Merbau decks off the family room and restorations of original timber decks suit these homes. Blocks here are often generous by today's standards, so a deck can sit beside a lawn and a garden rather than filling the whole yard.
Heaths, Morris and Hogans Roads are named after the farming families who worked this land. The northern streets toward them include newer homes on family blocks, where composite decks, alfresco decks with a roof and pool decks are popular.

Timber Decking
Treated pine and hardwood decks built off the alfresco on stumps sized to the soil, with boards spaced and oiled for strong western sun and wind.

Composite Decking
Composite decks that never need oiling, will not splinter and resist fading, with boards and colours chosen for Wyndham's strong summer sun.

Merbau Decking
Rich red-brown merbau hardwood decks with tannin bleed managed and oil coats chosen to hold their colour in Wyndham's strong summer sun.

Spotted Gum Decking
Spotted gum, blackbutt and ironbark hardwood decks: hard, long lasting Australian timbers in lighter tones, oiled to hold their colour in the sun.

Pool Decking
Timber and composite decks around inground, above ground and spa pools, built to the barrier rules, cool underfoot and fixed to handle water and chlorine.

Elevated Decks
Raised and multi-level decks for upper floors, sloping blocks and views, engineered for height and wind, with balustrades and stairs built to code.

Deck Privacy Screens
Timber, composite and aluminium slat screens that give a deck or alfresco privacy from close neighbours and shelter from the afternoon wind.

Deck Stairs & Balustrades
Glass, aluminium, wire and timber balustrades and deck stairs, built to the National Construction Code and fixed to stand up to the afternoon wind.

Alfresco Decks
Decks that extend the alfresco slab into the yard, with pergolas, roofs, outdoor kitchens, lighting and screens for outdoor living all year.

Deck Repairs
Rotted boards, loose frames, sinking stumps and wobbly balustrades repaired or replaced, so an ageing deck is safe, level and solid again.

Deck Restoration & Oiling
Grey, dry and stained decks cleaned, sanded and oiled, stained or sealed to bring back the colour and protect the timber from Wyndham's strong sun.

Deck Permits
When a deck in Wyndham needs a building permit, when the 800 mm rule triggers a planning permit, and how pools, boundaries and neighbours affect approval.
decking In Hoppers Crossing
The cost depends on the size, the boards and whether an old deck has to come out first. Treated pine is the most economical and composite the most expensive. A free measure gives a written, itemised quote.
If rot runs through the frame or the stumps have failed across the deck, replacement is usually better value. If the frame is sound, repairs and a restoration are often enough.
Usually because timber stumps have rotted or shallow footings have moved with the reactive clay. Restumping on new footings brings it back to level.
Most decks need a building permit. A deck over 800 mm high can also need a planning permit on a small lot or where an overlay applies.
Yes. The deck is framed so the boards finish just below the door sill, with no step down.
Peak Decking covers Hoppers Crossing, Werribee, Tarneit, Truganina, Williams Landing and the rest of Wyndham. A free measure can be booked for any address in the area.
GET A FREE QUOTE
BUSINESS
SERVICES
OPERATING HOURS
Sun: 6:00am - 10:00pm
Mon: 6:00am - 10:00pm
Tue: 6:00am - 10:00pm
Wed: 6:00am - 10:00pm
Thu: 6:00am - 10:00pm
Fri: 6:00am - 10:00pm
Sat: 6:00am - 10:00pm