An elevated deck brings the outdoor area up to the level of the house: off an upper-floor living room, over a sloping yard, or high enough to look out across the parkland and toward the bay. Raised decks carry more load and catch more wind than a low deck, and Point Cook gets plenty of both: Laverton RAAF, the nearest Bureau of Meteorology station, records a mean afternoon wind of 21 km/h across the year, rising to 23.5 km/h in December. Peak Decking designs and builds elevated and multi-level decks across Point Cook, Williams Landing, Werribee and the rest of Wyndham, with engineering for the height, footings sized to the basalt clay, and balustrades, stairs and permits handled.
GET A FREE QUOTE
12
Decking services
13
Point Cook and nearby suburbs covered
Free
Measure and written quote
3 steps
Measure, permit, build
Peak Decking Point Cook
Most decks in Wyndham sit low, just off the alfresco slab. A raised deck is the better answer in three situations.
Many newer double-storey homes in Point Cook, Williams Landing and Truganina have a living area or bedroom upstairs with doors to nowhere, or a small balcony that is too narrow to use. An elevated deck turns that doorway into a usable outdoor room, supported on posts so the area underneath stays open.
Where the yard falls away from the house, a deck built level with the floor stands well above the ground at its outer edge. That gives a large flat outdoor area without retaining walls or cut and fill, and makes use of a slope that would otherwise be wasted.
Point Cook sits on the shore of Port Phillip Bay, beside wetlands and coastal parkland. On blocks with an outlook, a raised deck lifts the view above the fences, and slim balustrades of glass or wire keep it open. The deck is oriented to catch the outlook while keeping the hottest western sun and the strongest afternoon wind off the main seating area, with a screen or a roof on the exposed side where needed.


Peak Decking Point Cook
An elevated deck does not have to be one large platform. Two layouts get more from the space.
A multi-level deck steps down in stages from the house to the yard, with each level used for something different: dining at the top, a lounge area below, steps that double as seating. Splitting the height into lower levels can also keep each part under the height limits that trigger stricter balustrade and planning requirements. Changing the board direction between levels, or adding a contrasting border at each edge, makes every step down easy to see, which matters for safety at night and for older visitors. A roof or pergola can cover the top level next to the house while the lower levels stay open to the sun.
On a high deck, the space underneath can be screened with battens and used for bins, bikes, a garden shed or a dry spot for outdoor furniture in winter. Where the deck is above a living space or a car, it can be built with a waterproof membrane or roofing under the boards so the area below stays dry.
Peak Decking Point Cook
Elevated deck builders in Point Cook need engineering, not just carpentry. Peak Decking measures, draws, engineers and builds each raised deck with the same team.
A raised deck stands on taller posts, with heavier bearers and joists sized for the span and the load of people and furniture. Diagonal bracing between posts, or a fixed connection to the house frame where the engineer allows it, stops the deck swaying or racking. The structural design is prepared by an engineer for each deck.
Wyndham sits on the western basalt plains, where the clay can shrink and swell with the seasons. A soil test sets the AS 2870 site class, and each post sits on a concrete footing sized and set to the depth the engineer specifies, so the deck does not move as the ground does.
The higher the deck, the more wind it catches, especially with privacy screens or a roof. Afternoon winds on the western plains peak in summer at Laverton RAAF, so the frame, balustrade posts and any screens are designed for the wind loads that apply to the site.


Peak Decking Point Cook
Safety on a raised deck comes down to the edges and the stairs, both of which are set by the National Construction Code.
Under the Code, a balustrade is generally required where the deck is more than 1 metre above the ground, at least 1 metre high, with openings that a 125 mm sphere cannot pass through. On higher decks, the design must also stop children climbing the balustrade. Glass, aluminium, steel wire and timber balustrades can all be built to these rules. See deck stairs and balustrades.
Stairs from a raised deck need consistent riser and tread sizes, a handrail and, on longer runs, a landing. Stairs are placed where they suit the way the yard is used and finished in the same boards as the deck. The building surveyor checks the stairs and balustrades at inspection.
Peak Decking Point Cook
Raised decks attract more rules than low ones, both for building and for privacy.
A raised deck needs a building permit. The drawings and engineering are prepared and lodged with a registered building surveyor, and the deck is inspected at the footing and final stages. See deck permits.
Under the Victoria Planning Provisions, a deck with a finished floor level more than 800 mm above ground can need a planning permit on a residential lot under 300 square metres, and overlays can also require one. Many newer homes in Point Cook and Williams Landing sit on smaller lots, so this is checked before the design is finalised.
A deck that looks into a neighbour's yard or windows can be required to have screening under the overlooking rules that apply to planning permits. Fixed screens to the required height on the affected sides solve this, and also give the deck more privacy. See deck privacy screens.


Peak Decking Point Cook
Every elevated deck is priced from a free measure and a written, itemised quote, so each part of the job is shown on its own line.
Height adds the most cost to a deck, through taller posts, heavier framing, bracing and engineering. Area and the choice of boards come next: treated pine is the most economical, hardwood sits in the middle and composite at the upper end. A multi-level deck adds framing for each level. On a high deck, the board choice also affects upkeep: composite or a hard Australian hardwood avoids the need to oil boards from a ladder, and a lighter colour keeps a sun-exposed upper deck cooler underfoot. Steel framing can replace timber posts on very tall decks where the engineer specifies it.
Stairs, landings and the balustrade are priced separately, with glass and aluminium at the upper end. Screening under the deck, privacy screens, and difficult access for long posts and beams are also listed on their own lines, along with the building and any planning permit.

A visit to measure the house and the yard, talk through boards, layouts and finishes, and then a written, itemised quote.

Drawings, engineering and a soil test are prepared, overlays are checked and the building permit is lodged.

Footings, frame and boards are built and inspected at each stage, the site is cleaned up and the finished deck is handed over.
Height adds the most cost, through taller posts, heavier framing, bracing and engineering. Area, boards, stairs and balustrades come next. A free measure gives a written, itemised quote.
Yes, a raised deck needs a building permit. A deck more than 800 mm above ground can also need a planning permit on a lot under 300 square metres.
Under the National Construction Code, generally at least 1 metre where the deck is more than 1 metre above ground, with gaps no larger than 125 mm.
Yes. An elevated deck on posts can be built off an upper-floor door, with stairs to the yard and the area underneath left open or screened.
It can. Fixed privacy screens on the affected sides meet the overlooking rules and give the deck more privacy.
Yes. It can be screened for storage, or built with a membrane or roof under the boards to stay dry.
GET A FREE QUOTE
BUSINESS
SERVICES
OPERATING HOURS
Sun: 6:00am - 10:00pm
Mon: 6:00am - 10:00pm
Tue: 6:00am - 10:00pm
Wed: 6:00am - 10:00pm
Thu: 6:00am - 10:00pm
Fri: 6:00am - 10:00pm
Sat: 6:00am - 10:00pm